Kyiv adopts an optimized heating network scheme in Teremky – it will save 160 trees

Key points

  • In Teremky an optimized version of the heating network construction has been approved.
  • Only about 10 plantings will be removed, some trees will only be pruned.
  • The scheme was developed over a month of joint work by the city, scientists, industry experts and the public.
  • The decision does not contradict current legal, construction, technical and technological norms and takes into account the requirements for backup power supply.

In Teremky they plan to implement an optimized version of the heating network construction that will allow saving about 160 trees, they reported to the Kyiv City State Administration.

Over the past month the city, together with scientists, industry experts and representatives of the public, processed various options for laying the network.

– Kyiv City State Administration.

As a result, a scheme was formed that foresees the removal of only about 10 plantings – only part of the trees will be pruned.

The proposed changes do not contradict current legal, construction, technical and technological norms. The decision also takes into account the requirements for building backup power sources and the tight preparation deadlines for winter.

The Kyiv City State Administration noted that, according to experts, there is no full and realistic alternative to the current project – due to the limited time until the heating season starts.

Read also: 
Lviv enters final of European Capitals of Tourism 2027 competition
Юлія Мирська
Юлія Мирська
Author | She graduated with a degree in television and radio journalism. She has about a year of experience working in the media. She worked as a news editor for the online publication Speka.media.

Social Networks

LEAVE A REPLY

Please enter your comment!
Please enter your name here